United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
ONSHORE WIND Β· MISOOnshore wind project H068, Rice County
Onshore wind project H068, Rice County is a 40.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Rice County, Minnesota.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2008 (completed)
- Withdrawn / abandonedMar 2010 (project stopped here)
- ConsentedMar 2010 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- H068
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- French Lake substation Shieldsville Twp
- Location
- Rice County, Minnesota
- Technology
- Wind: 40.0 MW
- Total requested
- 40.0 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 17 June 2008
- Agreement signed
- 1 March 2010
- Proposed online date
- September 2010
- Withdrawn
- March 2010
Location
Marker shows the centre of Rice County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Rice County
- Faribault Energy ParkGas Β· 394 MW Β· in study
- Gas project G173, Rice CountyGas Β· 300 MW Β· built
- Onshore wind project G924, Rice CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project H066, Rice CountyOnshore wind Β· 70.0 MW Β· withdrawn
- Gas project G336, Rice CountyGas Β· 55.0 MW Β· withdrawn
- Onshore wind project H056, Rice CountyOnshore wind Β· 40.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem