United States βΊ Grid βΊ Interconnection queues βΊ Virginia
GAS Β· PJMGas project Z1-078
Gas project Z1-078 is a 777 MW gas request withdrawn in the PJM interconnection queue, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2013 (completed)
- Withdrawn / abandonedNov 2014 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Z1-078
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Broadford-Jackson Ferry Phase II 765kV
- Location
- Virginia
- Technology
- Gas: 777 MW
- Total requested
- 777 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 30 October 2013
- Proposed online date
- June 2018
- Withdrawn
- November 2014
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem