United States βΊ Grid βΊ Interconnection queues βΊ Michigan
ONSHORE WIND Β· MISOOnshore wind project G755, Osceola County
Onshore wind project G755, Osceola County is a 50.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Osceola County, Michigan.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2007 (completed)
- Withdrawn / abandonedDec 2008 (project stopped here)
- ConsentedDec 2008 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G755
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- WPSC LeRoy - Cadillac 69 kV
- Location
- Osceola County, Michigan
- Technology
- Wind: 50.0 MW
- Total requested
- 50.0 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 28 February 2007
- Agreement signed
- 10 December 2008
- Proposed online date
- October 2009
- Withdrawn
- December 2008
Location
Marker shows the centre of Osceola County; the queue data does not give exact sites.
Other requests in Osceola County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem