United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
SOLAR Β· SOUTHEASTSolar project IC-689, Harrison County
Solar project IC-689, Harrison County is a 50.0 MW solar request withdrawn in the Southeast interconnection queue, in Harrison County, Mississippi, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedFeb 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-689
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- Gulfport Landon - Kiln 115 kV Line
- Location
- Harrison County, Mississippi
- Technology
- Solar: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- NRIS and ERIS
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 28 March 2018
- Withdrawn
- February 2019
Location
Marker shows the centre of Harrison County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Harrison County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem