Solar project AB1-004 is a 0.4 MW solar request withdrawn in the PJM interconnection queue, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2015 (completed)
- Withdrawn / abandonedMay 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AB1-004
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Solar Holler
- Technology
- Solar: 0.4 MW
- Total requested
- 0.4 MW
- Service type
- Energy only (ERIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 4 May 2015
- Proposed online date
- October 2015
- Withdrawn
- May 2015