HYDRO Β· SOUTHEASTHydro project 17108
Hydro project 17108 is a 27.0 MW hydro request built and operating in the Southeast interconnection queue.
Request details
- Queue ID
- 17108
- Grid region
- Southeast (non-ISO utilities)
- Developer
- Duke Energy Carolinas LLC
- Connection point (POI)
- Rhodhiss Hydro Substation
- Technology
- Hydro: 27.0 MW
- Total requested
- 27.0 MW
- Study phase
- Commercial Operation - Commercial Operation Date Declared
- Queue status
- Operational
- Entered queue
- 26 November 2012
- Came online
- September 2013
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem