AC Landfill Energy Units 1, 2, 3

AC Landfill Energy Units 1, 2, 3 is a 100 MW other request withdrawn in the PJM interconnection queue, connecting to APS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2007 (completed)
  2. Withdrawn / abandonedFeb 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
S07
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Connection point (POI)
Keystone-Branchburg
Technology
Other: 100 MW
Total requested
100 MW
Service type
Energy only (ERIS)
Study phase
Available studies: System Impact Study, Facilities Study
Queue status
Withdrawn
Entered queue
1 March 2007
Withdrawn
February 2013

Location

No county location in the queue data.