BATTERY STORAGE Β· MISOBattery storage project J2522, Mississippi County
Battery storage project J2522, Mississippi County is a 100 MW battery storage request withdrawn in the MISO interconnection queue, in Mississippi County, Arkansas, connecting to ENTERGY ARKANSAS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedMar 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2522
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY ARKANSAS
- Connection point (POI)
- AECC Manila - Dell EHV 161 kV (J2089 POI)
- Location
- Mississippi County, Arkansas
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 13 September 2022
- Proposed online date
- October 2026
- Withdrawn
- March 2023
Location
Marker shows the centre of Mississippi County; the queue data does not give exact sites.
Other requests in Mississippi County
- Solar project J1155, Mississippi CountySolar Β· 150 MW Β· under construction
- Solar project J1514, Mississippi CountySolar Β· 100 MW Β· under construction
- Solar project J1562, Mississippi CountySolar Β· 200 MW Β· agreement signed
- Solar project J586, Mississippi CountySolar Β· 175 MW Β· agreement signed
- Solar + storage project J1897, Mississippi CountySolar + storage Β· 500 MW Β· in study
- Solar + storage project J1899, Mississippi CountySolar + storage Β· 500 MW Β· in study
- Solar project J3401, Mississippi CountySolar Β· 500 MW Β· in study
- Solar project J2696, Mississippi CountySolar Β· 500 MW Β· in study
- Solar + storage project J2190, Mississippi CountySolar + storage Β· 500 MW Β· in study
- Solar project J1858, Mississippi CountySolar Β· 440 MW Β· in study
- Solar project J2294, Mississippi CountySolar Β· 250 MW Β· in study
- Solar project J2089, Mississippi CountySolar Β· 200 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem