Soapstone Solar and BESS

Soapstone Solar and BESS is a 100 MW solar request withdrawn in the PJM interconnection queue, in Clarke County, Virginia, connecting to APS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2020 (completed)
  2. Withdrawn / abandonedOct 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG1-182
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Connection point (POI)
Millville-Old Chapel 138 kV
Location
Clarke County, Virginia
Technology
Solar: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study
Queue status
Withdrawn
Entered queue
17 September 2020
Proposed online date
June 2023
Withdrawn
October 2024

Location

Marker shows the centre of Clarke County; the queue data does not give exact sites.

Power plants in Virginia Β· Transmission lines in Virginia

Other requests in Clarke County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem