United States βΊ Grid βΊ Interconnection queues βΊ Virginia
GAS Β· PJMGas project S52, Warren County
Gas project S52, Warren County is a 600 MW gas request withdrawn in the PJM interconnection queue, in Warren County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2007 (completed)
- Withdrawn / abandonedJul 2009 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- S52
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Morrisville 500kV
- Location
- Warren County, Virginia
- Technology
- Gas: 600 MW
- Total requested
- 600 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 29 May 2007
- Proposed online date
- May 2012
- Withdrawn
- July 2009
Location
Marker shows the centre of Warren County; the queue data does not give exact sites.
Other requests in Warren County
- Gas project AI2-020, Warren CountyGas Β· 19.0 MW Β· in study
- Warren CountyGas Β· 950 MW Β· built
- Warren CountyGas Β· 475 MW Β· built
- Warren CountyGas Β· 60.0 MW Β· built
- Warren County Power StationGas Β· 20.0 MW Β· built
- Warren County Power StationGas Β· 15.0 MW Β· built
- Gas project R77, Warren CountyGas Β· 600 MW Β· withdrawn
- Battery storage project AH1-747, Warren CountyBattery storage Β· 300 MW Β· withdrawn
- Gas project G00_W40, Warren CountyGas Β· 264 MW Β· withdrawn
- Battery storage project AG1-069, Warren CountyBattery storage Β· 150 MW Β· withdrawn
- Battery storage project AH1-048, Warren CountyBattery storage Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem