United States βΊ Grid βΊ Interconnection queues βΊ South Carolina
SOLAR + STORAGE Β· SOUTHEASTSolar + storage project 20230829009, Barnwell County
Solar + storage project 20230829009, Barnwell County is a 50.0 MW solar + storage request withdrawn in the Southeast interconnection queue, in Barnwell County, South Carolina, connecting to Dominion Energy South Carolina.
Queue statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 20230829009
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Dominion Energy South Carolina
- Connection point (POI)
- Denmark - Toolebeck 115kV
- Location
- Barnwell County, South Carolina
- Technology
- Solar: 50.0 MW Β· Battery
- Total requested
- 50.0 MW
- Queue status
- Withdrawn
- Proposed online date
- June 2027
Location
Marker shows the centre of Barnwell County; the queue data does not give exact sites.
Power plants in South Carolina Β· Transmission lines in South Carolina
Other requests in Barnwell County
- Solar + storage project 20230829007, Barnwell CountySolar + storage Β· 74.9 MW Β· in study
- Solar project 20240829007, Barnwell CountySolar Β· 74.8 MW Β· in study
- Solar project 20240829014, Barnwell CountySolar Β· 74.5 MW Β· in study
- Gas project 314, Barnwell CountyGas Β· 635 MW Β· withdrawn
- Solar project 20180209001, Barnwell CountySolar Β· 113 MW Β· withdrawn
- Solar project 58, Barnwell CountySolar Β· 75.0 MW Β· withdrawn
- Solar project 20240829015, Barnwell CountySolar Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem