United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

Copperleaf Energy Storage Increase

Copperleaf Energy Storage Increase is a 139 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
28INR0220
Grid region
ERCOT (Texas)
Developer
Copperleaf Energy Storage, LLC
Connection point (POI)
Tap 345 kV (#1425) Fisher Road Switch - (#6101) Riley
Technology
Battery: 139 MW
Total requested
139 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Proposed online date
December 2028

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem