United States βΊ Grid βΊ Interconnection queues
HYDRO Β· WESTHydro project 35 (PSE_x000D_ Merchant)
Hydro project 35 (PSE_x000D_ Merchant) is a 30.0 MW hydro request built and operating in the West interconnection queue.
Request details
- Queue ID
- 35 (PSE_x000D_ Merchant)
- Grid region
- West (non-ISO utilities)
- Connection point (POI)
- Baker River Switching Station
- Technology
- Hydro: 30.0 MW
- Total requested
- 30.0 MW
- Study phase
- LGIA / In Service Accepted
- Queue status
- Operational
- Proposed online date
- April 2013
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem