United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

BATTERY STORAGE Β· MISO

Battery storage project J3791, Houston County

Battery storage project J3791, Houston County is a 50.0 MW battery storage request withdrawn in the MISO interconnection queue, in Houston County, Minnesota, connecting to SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedSep 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3791
Grid region
MISO (Midcontinent)
Utility / transmission owner
SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY
Connection point (POI)
Caledonia
Location
Houston County, Minnesota
Technology
Battery: 50.0 MW
Total requested
50.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
17 April 2024
Proposed online date
May 2028
Withdrawn
September 2025

Location

Marker shows the centre of Houston County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem