Onshore wind project GI-0709, Pondera County

Onshore wind project GI-0709, Pondera County is a 250 MW onshore wind request withdrawn in the West interconnection queue, in Pondera County, Montana, connecting to WAPA/BEPC/HCPD Integrated System.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2007 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-0709
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA/BEPC/HCPD Integrated System
Connection point (POI)
Conrad 230kV
Location
Pondera County, Montana
Technology
Wind: 250 MW
Total requested
250 MW
Service type
NRIS and ERIS
Study phase
IAP
Queue status
Withdrawn
Entered queue
16 May 2007
Proposed online date
December 2008

Location

Marker shows the centre of Pondera County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Pondera County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem