United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

Pajarita Energy Storage

Pajarita Energy Storage is a 150 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0430
Grid region
ERCOT (Texas)
Developer
VESI 29 LLC
Connection point (POI)
8266 Marconi 138kV
Technology
Battery: 150 MW
Total requested
150 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Proposed online date
October 2023

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem