United States › Grid › Interconnection queues › Idaho

WIND + STORAGE · CAISO

Salmon Falls Wind

Salmon Falls Wind is a 1,356 MW wind + storage request withdrawn in the CAISO interconnection queue, in Twin Falls County, Idaho, connecting to DSLK.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedJan 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2152
Grid region
CAISO (California)
Utility / transmission owner
DSLK
Connection point (POI)
Harry Allen-Eldorado 500 kV
Location
Twin Falls County, Idaho
Technology
Wind: 836 MW · Battery: 520 MW
Total requested
1,356 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
December 2026
Withdrawn
January 2023

Location

Marker shows the centre of Twin Falls County; the queue data does not give exact sites.

Power plants in Idaho · Transmission lines in Idaho

Other requests in Twin Falls County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem