ONSHORE WIND Β· ERCOT

Penascal Wind Farm 5

Penascal Wind Farm 5 is a 200 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2004 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
06INR0022d
Grid region
ERCOT (Texas)
Developer
PPM Energy, Inc
Technology
Wind: 200 MW
Total requested
200 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
20 December 2004
Proposed online date
December 2050

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem