πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Missouri

ONSHORE WIND Β· SOUTHEAST

Onshore wind project GI-113, Randolph County

Onshore wind project GI-113, Randolph County is a 500 MW onshore wind request withdrawn in the Southeast interconnection queue, in Randolph County, Missouri, connecting to Associated Electric Cooperative, Incorporated.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-113
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Associated Electric Cooperative, Incorporated
Connection point (POI)
McCredie 345 kV
Location
Randolph County, Missouri
Technology
Wind: 500 MW
Total requested
500 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
13 January 2023
Proposed online date
December 2026

Location

Marker shows the centre of Randolph County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Randolph County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem