Other project X4-038

Other project X4-038 is a 500 MW other request withdrawn in the PJM interconnection queue, connecting to PPL.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2012 (completed)
  2. Withdrawn / abandonedNov 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
X4-038
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PPL
Connection point (POI)
TMI-PPL
Technology
Other: 500 MW
Total requested
500 MW
Service type
Energy only (ERIS)
Study phase
Available studies: System Impact Study, Facilities Study
Queue status
Withdrawn
Entered queue
30 January 2012
Withdrawn
November 2014

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem