SOLAR Β· SPPSolar project GEN-2021-003, Richland County
Solar project GEN-2021-003, Richland County is a 75.5 MW solar request withdrawn in the SPP interconnection queue, in Richland County, Montana, connecting to WAPA.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2020 (completed)
- Withdrawn / abandonedJul 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingDec 2024 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2021-003
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WAPA
- Connection point (POI)
- Fairview 115kV Substation
- Location
- Richland County, Montana
- Technology
- Solar: 75.5 MW
- Total requested
- 75.5 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 11 December 2020
- Proposed online date
- December 2024
- Came online
- December 2024
- Withdrawn
- July 2023
Location
Marker shows the centre of Richland County; the queue data does not give exact sites.
Other requests in Richland County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem