United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR Β· PJMSolar project AH1-184, Powhatan County
Solar project AH1-184, Powhatan County is a 5.0 MW solar request withdrawn in the PJM interconnection queue, in Powhatan County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-184
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Powhatan - Powhatan DP 24.94 kV
- Location
- Powhatan County, Virginia
- Technology
- Solar: 5.0 MW
- Total requested
- 5.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 31 August 2021
- Proposed online date
- December 2022
- Withdrawn
- December 2024
Location
Marker shows the centre of Powhatan County; the queue data does not give exact sites.
Other requests in Powhatan County
- Solar project AH1-071, Powhatan CountySolar Β· 20.0 MW Β· in study
- Cartersville SolarSolar Β· 99.9 MW Β· suspended
- Solar project AB2-026, Powhatan CountySolar Β· 20.0 MW Β· built
- Powhatan Solar I, LLCSolar Β· 18.0 MW Β· built
- Scott 1 BESSSolar + storage Β· 17.0 MW Β· built
- Solar project AF2-244, Powhatan CountySolar Β· 15.0 MW Β· withdrawn
- Solar project AH1-349, Powhatan CountySolar Β· 15.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem