SOLAR Β· MISOSolar project J1500, George County
Solar project J1500, George County is a 150 MW solar request withdrawn in the MISO interconnection queue, in George County, Mississippi, connecting to COOPERATIVE ENERGY.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandonedDec 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1500
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- COOPERATIVE ENERGY
- Connection point (POI)
- SE Greene Co 230kV substation
- Location
- George County, Mississippi
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 19 June 2020
- Proposed online date
- October 2023
- Withdrawn
- December 2021
Location
Marker shows the centre of George County; the queue data does not give exact sites.