BATTERY STORAGE Β· ERCOT

Compton BESS

Compton BESS is a 10.0 MW battery storage request in interconnection study in the ERCOT interconnection queue.

Queue statusIn planning
  1. PlanningQueued Aug 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Apr 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
25INR0699
Grid region
ERCOT (Texas)
Developer
SMT Dallas VII LLC
Connection point (POI)
POIB 2981 ERCOT Bus name COMPTON1_8 ERCOT load name LDLXFMR1 Oncor XFMR number 1
Technology
Battery: 10.0 MW
Total requested
10.0 MW
Study phase
No MRD
Queue status
Active
Entered queue
29 August 2024
Proposed online date
April 2027

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem