United States βΊ Grid βΊ Interconnection queues βΊ Kentucky
SOLAR Β· PJMSolar project AH1-163
Solar project AH1-163 is a 100 MW solar request withdrawn in the PJM interconnection queue, connecting to EKPC.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandonedJan 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-163
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- EKPC
- Developer
- Derby Solar Farm, LLC
- Connection point (POI)
- Millersburg 69 kV
- Location
- Kentucky
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Withdrawn
- Entered queue
- 1 September 2021
- Proposed online date
- July 2025
- Withdrawn
- January 2025
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem