United States βΊ Grid βΊ Interconnection queues βΊ Kentucky
ONSHORE WIND Β· SOUTHEASTOnshore wind project LGE-GIS-2024-007, Harlan County
Onshore wind project LGE-GIS-2024-007, Harlan County is a 250 MW onshore wind request withdrawn in the Southeast interconnection queue, in Harlan County, Kentucky, connecting to Louisville Gas & Electric and Kentucky Utilities Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- LGE-GIS-2024-007
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Louisville Gas & Electric and Kentucky Utilities Energy
- Connection point (POI)
- Arnold Substation 161 kV
- Location
- Harlan County, Kentucky
- Technology
- Wind: 250 MW
- Total requested
- 250 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 5 June 2024
- Proposed online date
- September 2028
Location
Marker shows the centre of Harlan County; the queue data does not give exact sites.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem