COAL Β· ERCOTSandow 5
Sandow 5 is a 581 MW coal request built and operating in the ERCOT interconnection queue.
Request details
- Queue ID
- 08INR0003
- Grid region
- ERCOT (Texas)
- Developer
- TXU Generation
- Connection point (POI)
- SD5SES_UNIT524.000
- Technology
- Coal: 581 MW
- Total requested
- 581 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 10 November 2005
- Agreement signed
- 30 January 2007
- Proposed online date
- April 2009
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem