BATTERY STORAGE Β· WEST

Battery storage project GI-CS-2025-06, Rio Blanco County

Battery storage project GI-CS-2025-06, Rio Blanco County is a 150 MW battery storage request withdrawn in the West interconnection queue, in Rio Blanco County, Colorado, connecting to Tri-State Generation and Transmission Association.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2025 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-CS-2025-06
Grid region
West (non-ISO utilities)
Utility / transmission owner
Tri-State Generation and Transmission Association
Connection point (POI)
Meeker 138kV Substation
Location
Rio Blanco County, Colorado
Technology
Battery: 150 MW
Total requested
150 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
18 September 2025
Proposed online date
December 2029

Location

Marker shows the centre of Rio Blanco County; the queue data does not give exact sites.

Power plants in Colorado Β· Transmission lines in Colorado

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem