SOLAR · PJMMercer County Solar Project
Mercer County Solar Project is a 95.0 MW solar request withdrawn in the PJM interconnection queue, in Mercer County, Kentucky, connecting to EKPC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedNov 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AD2-072
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- EKPC
- Connection point (POI)
- Van Arsdell-Mercer Industrial 69kV
- Location
- Mercer County, Kentucky
- Technology
- Solar: 95.0 MW
- Total requested
- 95.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 14 March 2018
- Proposed online date
- June 2023
- Withdrawn
- November 2024
Location
Marker shows the centre of Mercer County; the queue data does not give exact sites.
Other requests in Mercer County
- Gas project LGE-GIS-2023-002, Mercer CountyGas · 660 MW · agreement signed
- Solar project LGE-GIS-2019-025, Mercer CountySolar · 99.0 MW · agreement signed
- Solar project LGE-GIS-2014-001, Mercer CountySolar · 10.0 MW · agreement signed
- Hydro project LGE-GIS-2011-005, Mercer CountyHydro · 6.0 MW · agreement signed
- Battery storage project LGE-GIS-2023-003, Mercer CountyBattery storage · 125 MW · in study
- Solar project LGE-GIS-2024-004, Mercer CountySolar · 22.0 MW · in study
- Gas project LGE-GIS-2011-004, Mercer CountyGas · 880 MW · withdrawn
- Gas project LGE-GIS-2022-011, Mercer CountyGas · 660 MW · withdrawn
- Gas project LGE-GIS-2022-004, Mercer CountyGas · 660 MW · withdrawn
- Gas project LGE-GIS-2021-006, Mercer CountyGas · 635 MW · withdrawn
- Other project G004, Mercer CountyOther · 174 MW · withdrawn
- Battery storage project LGE-GIS-2023-001, Mercer CountyBattery storage · 125 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem