United States › Grid › Interconnection queues › Washington

HYDRO · WEST

Hydro project 42, Benton County

Hydro project 42, Benton County is a 5.6 MW hydro request built and operating in the West interconnection queue, in Benton County, Washington, connecting to PacifiCorp.

Queue statusOperating
  1. PlanningQueued Apr 2004 (completed)
  2. ConsentedOct 2007 (completed)
  3. Construction (completed)
  4. OperatingTarget Sep 2006 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
42
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Developer
Southern California Public Power Authority
Connection point (POI)
Tieton substation
Location
Benton County, Washington
Technology
Hydro: 5.6 MW
Total requested
5.6 MW
Service type
Energy only (ERIS)
Study phase
IA signed October 22, 2007
Queue status
Operational
Entered queue
28 April 2004
Agreement signed
22 October 2007
Proposed online date
September 2006

Location

Marker shows the centre of Benton County; the queue data does not give exact sites.

Power plants in Washington · Transmission lines in Washington

Other requests in Benton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem