GAS Β· ERCOT

GCWA_Gen_1

GCWA_Gen_1 is a 5.0 MW gas request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedMay 2014 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
14INR0076
Grid region
ERCOT (Texas)
Developer
Enchanted Rock
Technology
Gas: 5.0 MW
Total requested
5.0 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
19 February 2014
Agreement signed
21 May 2014
Proposed online date
July 2014

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem