United States βΊ Grid βΊ Interconnection queues βΊ New York
SOLAR Β· NYISOSilver Lake Solar
Silver Lake Solar is a 24.9 MW solar request withdrawn in the NYISO interconnection queue, in Wyoming County, New York, connecting to NYSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2017 (completed)
- Withdrawn / abandonedAug 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 629
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- Silver Lake Solar, LLC
- Connection point (POI)
- South Perry 34.5kV
- Location
- Wyoming County, New York
- Technology
- Solar: 24.9 MW
- Total requested
- 24.9 MW
- Queue status
- Withdrawn
- Entered queue
- 27 April 2017
- Withdrawn
- August 2023
Location
Marker shows the centre of Wyoming County; the queue data does not give exact sites.
Other requests in Wyoming County
- Swiss Valley Energy StorageBattery storage Β· 300 MW Β· in study
- Highview SolarSolar Β· 20.0 MW Β· in study
- Niagara SolarSolar Β· 20.0 MW Β· in study
- Wethersfield 230kVOnshore wind Β· 126 MW Β· built
- Wethersfield 230kVOnshore wind Β· 126 MW Β· built
- High Sheldon WindfarmOnshore wind Β· 113 MW Β· built
- High Sheldon WindfarmOnshore wind Β· 113 MW Β· built
- Stony Creek Wind FarmOnshore wind Β· 92.8 MW Β· built
- Stony Creek Wind FarmOnshore wind Β· 92.8 MW Β· built
- Bliss WindfieldOnshore wind Β· 72.0 MW Β· built
- Bliss WindfieldOnshore wind Β· 72.0 MW Β· built
- Bliss II WindfieldOnshore wind Β· 28.5 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem