ONSHORE WIND Β· WESTOnshore wind project 2007-G10
Onshore wind project 2007-G10 is a 125 MW onshore wind request withdrawn in the West interconnection queue, connecting to WAPA Rocky Mountain Region.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2007 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 2007-G10
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA Rocky Mountain Region
- Connection point (POI)
- Sidney-Archer 115-kV
- Technology
- Wind: 125 MW
- Total requested
- 125 MW
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 13 December 2007
- Proposed online date
- September 2011