United States β€Ί Grid β€Ί Interconnection queues

OTHER Β· PJM

Other project AC2-065

Other project AC2-065 is a 50.0 MW other request withdrawn in the PJM interconnection queue, connecting to Dayton.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2017 (completed)
  2. Withdrawn / abandonedMay 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AC2-065
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dayton
Connection point (POI)
Delaware-Darby 138kV
Technology
Other: 50.0 MW
Total requested
50.0 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
22 February 2017
Proposed online date
June 2018
Withdrawn
May 2017

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem