SOLAR Β· PJM

TWE Myrtle Solar

TWE Myrtle Solar is a 15.0 MW solar request withdrawn in the PJM interconnection queue, in City Of Suffolk County, Virginia, connecting to Dominion.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2016 (completed)
  2. Withdrawn / abandonedJun 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AC1-045
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Connection point (POI)
King's Fork 34.5kV
Location
City Of Suffolk County, Virginia
Technology
Solar: 15.0 MW
Total requested
15.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
Queue status
Withdrawn
Entered queue
31 August 2016
Proposed online date
November 2018
Withdrawn
June 2018

Location

Marker shows the centre of City Of Suffolk County; the queue data does not give exact sites.

Power plants in Virginia Β· Transmission lines in Virginia

Other requests in City Of Suffolk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem