United States β€Ί Grid β€Ί Interconnection queues

GAS Β· WEST

Gas project 2022-G1

Gas project 2022-G1 is a 307 MW gas request withdrawn in the West interconnection queue, connecting to WAPA Rocky Mountain Region.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2022-G1
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA Rocky Mountain Region
Connection point (POI)
Hesperus - San Juan 345-kV
Technology
Gas: 307 MW
Total requested
307 MW
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
15 February 2022
Proposed online date
April 2026

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem