United States βΊ Grid βΊ Interconnection queues βΊ South Carolina
SOLAR Β· SOUTHEASTSolar project 145, Williamsburg County
Solar project 145, Williamsburg County is a 400 MW solar request withdrawn in the Southeast interconnection queue, in Williamsburg County, South Carolina, connecting to Santee Cooper.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 145
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Santee Cooper
- Location
- Williamsburg County, South Carolina
- Technology
- Solar: 400 MW
- Total requested
- 400 MW
- Service type
- NRIS and ERIS
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 8 May 2020
- Proposed online date
- June 2023
Location
Marker shows the centre of Williamsburg County; the queue data does not give exact sites.
Power plants in South Carolina Β· Transmission lines in South Carolina
Other requests in Williamsburg County
- Solar project 171, Williamsburg CountySolar Β· 249 MW Β· under construction
- Solar project 925531, Williamsburg CountySolar Β· 74.9 MW Β· under construction
- Solar project 244, Williamsburg CountySolar Β· 175 MW Β· in study
- Solar project 270, Williamsburg CountySolar Β· 150 MW Β· in study
- Solar project 278, Williamsburg CountySolar Β· 150 MW Β· in study
- Solar project 246, Williamsburg CountySolar Β· 75.0 MW Β· in study
- Battery storage project 251, Williamsburg CountyBattery storage Β· 75.0 MW Β· in study
- Battery storage project 230, Williamsburg CountyBattery storage Β· 74.9 MW Β· in study
- Battery storage project 312, Williamsburg CountyBattery storage Β· 74.9 MW Β· in study
- Battery storage project 223, Williamsburg CountyBattery storage Β· 74.5 MW Β· in study
- Battery storage project 313, Williamsburg CountyBattery storage Β· 55.0 MW Β· in study
- Solar project 977121, Williamsburg CountySolar Β· 6.0 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem