United States β€Ί Grid β€Ί Interconnection queues β€Ί Missouri

BATTERY STORAGE Β· MISO

Battery storage project J2506, Boone County

Battery storage project J2506, Boone County is a 100 MW battery storage request withdrawn in the MISO interconnection queue, in Boone County, Missouri, connecting to CITY OF COLUMBIA, MISSOURI (WATER AND LIGHT DEPT.).

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedOct 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2506
Grid region
MISO (Midcontinent)
Utility / transmission owner
CITY OF COLUMBIA, MISSOURI (WATER AND LIGHT DEPT.)
Connection point (POI)
5BOLSTAD 161kV Substation
Location
Boone County, Missouri
Technology
Battery: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
15 September 2022
Proposed online date
November 2026
Withdrawn
October 2025

Location

Marker shows the centre of Boone County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Boone County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem