ONSHORE WIND · ERCOTStephens Ranch Wind Energy Phase 1
Stephens Ranch Wind Energy Phase 1 is a 211 MW onshore wind request built and operating in the ERCOT interconnection queue.
Request details
- Queue ID
- 12INR0034a
- Grid region
- ERCOT (Texas)
- Developer
- Wind Tex Energy, LP
- Connection point (POI)
- Long Draw (59900)
- Technology
- Wind: 211 MW
- Total requested
- 211 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 1 September 2009
- Agreement signed
- 26 March 2012
- Proposed online date
- December 2014
- Came online
- December 2014