United States βΊ Grid βΊ Interconnection queues βΊ New Jersey
SOLAR Β· PJMSolar project AF1-111
Solar project AF1-111 is a 2.0 MW solar request withdrawn in the PJM interconnection queue, connecting to PSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2019 (completed)
- Withdrawn / abandonedSep 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF1-111
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PSEG
- Connection point (POI)
- Kingsland 26 kV
- Location
- New Jersey
- Technology
- Solar: 2.0 MW
- Total requested
- 2.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 10 September 2019
- Withdrawn
- September 2019
Location
No county location in the queue data.
Power plants in New Jersey Β· Transmission lines in New Jersey
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem