United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
ONSHORE WIND Β· MISOOnshore wind project J006, Nicollet County
Onshore wind project J006, Nicollet County is a 25.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Nicollet County, Minnesota.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2008 (completed)
- Withdrawn / abandonedMar 2011 (project stopped here)
- ConsentedMar 2011 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J006
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Ft. Ridgely - Lafayette 69kV
- Location
- Nicollet County, Minnesota
- Technology
- Wind: 25.0 MW
- Total requested
- 25.0 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 29 October 2008
- Agreement signed
- 7 March 2011
- Proposed online date
- November 2012
- Withdrawn
- March 2011
Location
Marker shows the centre of Nicollet County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem