United States βΊ Grid βΊ Interconnection queues
ONSHORE WIND Β· ERCOTRed Canyon
Red Canyon is a 84.0 MW onshore wind request built and operating in the ERCOT interconnection queue.
Request details
- Queue ID
- 05INR0017
- Grid region
- ERCOT (Texas)
- Developer
- Post Wind Farm LP
- Connection point (POI)
- RDCAN_RDCNY134.500
- Technology
- Wind: 84.0 MW
- Total requested
- 84.0 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 24 September 2004
- Agreement signed
- 24 October 2005
- Proposed online date
- April 2006
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem