HYDRO Β· WESTHydro project 45, Wasatch County
Hydro project 45, Wasatch County is a 12.0 MW hydro request withdrawn in the West interconnection queue, in Wasatch County, Utah, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2004 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 45
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Circuit out of New Jordanelle Dam substation
- Location
- Wasatch County, Utah
- Technology
- Hydro: 12.0 MW
- Total requested
- 12.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- WITHDRAWN BY CUSTOMER
- Queue status
- Withdrawn
- Entered queue
- 9 July 2004
- Proposed online date
- January 2007
Location
Marker shows the centre of Wasatch County; the queue data does not give exact sites.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem