COAL Β· ERCOT

Limestone 3

Limestone 3 is a 875 MW coal request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2007 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
12INR0006
Grid region
ERCOT (Texas)
Developer
NRG Energy, Inc
Technology
Coal: 875 MW
Total requested
875 MW
Study phase
FIS Complete
Queue status
Withdrawn
Entered queue
8 August 2007
Proposed online date
December 2050

Location

No county location in the queue data.

Power plants in Β· Transmission lines in