United States βΊ Grid βΊ Interconnection queues
ONSHORE WIND Β· WESTOnshore wind project 2017-G6
Onshore wind project 2017-G6 is a 500 MW onshore wind request withdrawn in the West interconnection queue, connecting to WAPA Rocky Mountain Region.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2017 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 2017-G6
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA Rocky Mountain Region
- Connection point (POI)
- Archer 230-kV
- Technology
- Wind: 500 MW
- Total requested
- 500 MW
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 22 August 2017
- Proposed online date
- December 2020
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem