United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

ONSHORE WIND Β· WEST

Onshore wind project G0282, Benton County

Onshore wind project G0282, Benton County is a 100 MW onshore wind request withdrawn in the West interconnection queue, in Benton County, Washington.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2007 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G0282
Grid region
West (non-ISO utilities)
Connection point (POI)
Chandler 115 kV line
Location
Benton County, Washington
Technology
Wind: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
10 August 2007
Proposed online date
October 2011

Location

Marker shows the centre of Benton County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Benton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem