United States βΊ Grid βΊ Interconnection queues βΊ Washington
GAS Β· WEST1300MW Sickler-Schultz
1300MW Sickler-Schultz is a 1,300 MW gas request withdrawn in the West interconnection queue, in Benton County, Washington, connecting to Calpine Energy Services, L.P..
Queue statusWithdrawn / abandoned
- PlanningQueued May 2001 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G60
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Calpine Energy Services, L.P.
- Developer
- Calpine Energy Services, L.P.
- Connection point (POI)
- Sickler-Schultz 500 kV
- Location
- Benton County, Washington
- Technology
- Gas: 1,300 MW
- Total requested
- 1,300 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 31 May 2001
- Proposed online date
- June 2005
Location
Marker shows the centre of Benton County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in Benton County
- Solar + storage project G0822, Benton CountySolar + storage Β· 4,000 MW Β· in study
- Nuclear project G0998, Benton CountyNuclear Β· 1,120 MW Β· in study
- Solar + storage project G0670, Benton CountySolar + storage Β· 1,000 MW Β· in study
- Solar + storage project G0688, Benton CountySolar + storage Β· 1,000 MW Β· in study
- Solar + storage project G1040, Benton CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G0932, Benton CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G1037, Benton CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G1039, Benton CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G0920, Benton CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G0933, Benton CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G1038, Benton CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G0684, Benton CountySolar + storage Β· 705 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem