United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
SOLAR + STORAGE Β· MISOSolar + storage project J3309, Copiah County
Solar + storage project J3309, Copiah County is a 200 MW solar + storage request withdrawn in the MISO interconnection queue, in Copiah County, Mississippi, connecting to ENTERGY MISSISSIPPI, LLC..
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedMay 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3309
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY MISSISSIPPI, LLC.
- Connection point (POI)
- FRANKLIN EHV - RAY BRASWELL EHV 500.0kV
- Location
- Copiah County, Mississippi
- Technology
- Solar: 200 MW Β· Battery
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 15 April 2024
- Proposed online date
- June 2028
- Withdrawn
- May 2025
Location
Marker shows the centre of Copiah County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem