United States β€Ί Grid β€Ί Interconnection queues β€Ί Michigan

ONSHORE WIND Β· MISO

Onshore wind project J300, Mackinac County

Onshore wind project J300, Mackinac County is a 60.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Mackinac County, Michigan.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2013 (completed)
  2. Withdrawn / abandonedJun 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J300
Grid region
MISO (Midcontinent)
Connection point (POI)
Existing Pine River Substation
Location
Mackinac County, Michigan
Technology
Wind: 60.0 MW
Total requested
60.0 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
18 November 2013
Withdrawn
June 2015

Location

Marker shows the centre of Mackinac County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Other requests in Mackinac County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem