ONSHORE WIND Β· MISOOnshore wind project J300, Mackinac County
Onshore wind project J300, Mackinac County is a 60.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Mackinac County, Michigan.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2013 (completed)
- Withdrawn / abandonedJun 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J300
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Existing Pine River Substation
- Location
- Mackinac County, Michigan
- Technology
- Wind: 60.0 MW
- Total requested
- 60.0 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 18 November 2013
- Withdrawn
- June 2015
Location
Marker shows the centre of Mackinac County; the queue data does not give exact sites.
Other requests in Mackinac County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem