United States βΊ Grid βΊ Interconnection queues βΊ Kentucky
SOLAR + STORAGE Β· PJMSolar + storage project AG2-158, Russell County
Solar + storage project AG2-158, Russell County is a 44.0 MW solar + storage request withdrawn in the PJM interconnection queue, in Russell County, Kentucky, connecting to EKPC.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2021 (completed)
- Withdrawn / abandonedFeb 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-158
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- EKPC
- Location
- Russell County, Kentucky
- Technology
- Solar: 44.0 MW Β· Battery
- Total requested
- 44.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 25 February 2021
- Proposed online date
- September 2023
- Withdrawn
- February 2021
Location
Marker shows the centre of Russell County; the queue data does not give exact sites.
Other requests in Russell County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem